Above the entrance · Riviera Beach

Channel letter signs in Riviera Beach.

Make your business easy to find.

A building sign should be readable from the approach and suited to the facade. Discuss lettering size, lighting style and mounting with us before committing to a design.

Free quote. Opens our project chat. Call if you prefer to talk.

Sign design illustration. Your design is made for your business.

Find the right fit

Options for your project.

Dimensional and illuminated lettering for storefronts and commercial buildings.

  • 01Front-lit lettering
  • 02Halo-lit lettering
  • 03Non-illuminated letters
  • 04Custom building identification

A better brief. A clearer quote.

Let’s get the
details right.

Send what you have. You don’t need a finished design to start a conversation. These details help us understand the work and next steps.

  1. 1.Building address and facade photos
  2. 2.Approximate available sign area
  3. 3.Your logo and preferred lighting style
  4. 4.Landlord sign criteria and existing approvals

Let’s talk about the quote

The right scope.
Then the right price.

Two signs can look similar and involve very different work. These are the details that shape your quote.

  • 01Letter size, quantity & construction
  • 02Front-lit, halo-lit or unlit finish
  • 03Mounting, electrical access & facade
  • 04Artwork, installation & approval scope
Talk through my project

A conversation first. A free quote for your scope.

Your Riviera Beach project

Distinguish site-plan approval from the sign permit.

Riviera Beach's published site-plan application material notes that sign approval requires a separate building-permit submission. A sign shown in development drawings should therefore be discussed with the permit team before treating it as ready for fabrication or installation.

Riviera Beach published site-plan review material (PDF) ↗

Details to include

Are the letters illuminated? Show the available wall area, electrical access and any existing raceway or mounting points.

Collect the approved site plan and any sign-related review comments. Identify what is new, what remains and whether the sign is part of a larger property project, then confirm the current sign-submission requirements with Building Services.

Confirm current requirements with the city and property owner before fabrication. This is a service area, not a separate office.

All signs and wraps in Riviera Beach ↗

Before you start.

Do building signs need approval?

Requirements depend on the property and local jurisdiction. Confirm any permit, electrical and landlord requirements before fabrication.

What do you need to prepare a quote?

Tell us the service you need, your city and your target date. Photos, approximate dimensions and logo files help us understand the scope. For vehicle wraps, include the vehicle year, make and model.

How long will my project take?

Timing depends on the sign or wrap, artwork approval, material availability and installation requirements. Share your deadline so the schedule can be confirmed for your project.

Explore other services

Plan with confidence

Make the next decision easier.

Planning for your kind of business

Your next first impression starts here

Let’s put your
business out there.

A location. A vehicle. An idea.
Tell us what you’re working on.

Get my free quote(754) 544-2775 ↗

Quote button opens our project chat.
Prefer email? info@graphixhousefl.com

GRAPHIX HOUSE FL LLC, 642 Woodgate Ln, Sunrise, FL 33326
Office: (954) 702-5706